Call any time for a free quote on your commercial project whether it's landscape management, landscape construction, or snow removal.

314.892.9500



 


 

BALD HILL ROAD

PROJECT TYPE: Bio-Stabilization
CLIENT: City of Eureka
APPROX VALUE: $160,000
ENGINEER: Shively Geotechnical

PROJECT SUMMARY: 
Installation of new retaining walls and a box culvert to control stormwater flow.

PROJECT SOLUTION:
Over 1,500 square feet of Hercules Neptune retain walls were placed to line the channel.  The gaps in the blocks were planted with sedum.  Also in this project were several miscellaneous grade controls, such as coir logs with TRM's.  Additionally there was installation of live stake plantings and a guard rail as well as light paving around the site.

SPECIAL CONSIDERATIONS:
During construction it was found that the existing culvert was ready to collapse so Ideal was contracted to install approximately 36 feet of 8'x4' box culvert.  These sections  weighed over 10,000 pounds each.  The size and weight of the sections forced Ideal to bring out the big guns and we enlisted the biggest backhoe used up until that date on any St. Louis project to set them into place.

PHOTOS:

   
Description
 
Description
 
Description
Description
Description
 
Description.
 
Description.
 
Description.
Description
 


HOME
          ABOUT US          MAINTENANCE          CONSTRUCTION          CONTACT US
©2008 Ideal Landscape Group, All Rights Reserved.       Privacy Policy  |  Legal Information  |