FAWN VALLEY - HARWOOD STORM CHANNEL

PROJECT TYPE:  Storm Channel Improvements
CLIENT: Metropolitan Sewer District
APPROX VALUE: $130,000
DURATION: March 2006 - April 2006

PROJECT SUMMARY: 
Installation of modular block wall behind six residences to control severe erosion from the Hardwood storm channel which had begun encroaching onto private property.

PROJECT SOLUTION:
A Hercules Mega Retaining wall was constructed to stop the erosion.  The wall was 600 feet long and 6 feet tall consisting of 130 pound blocks which were each laid by hand.  Restoration of sod and other plants was added to restore the area to its previous aesthetic condition.  Additionally, new chain link fence was also installed to keep people away from the channel. 

SPECIAL CONSIDERATIONS:
Access to the project was through the channel itself, making construction cramped and difficult.