HAZELWOOD MIDDLE SCHOOL

PROJECT TYPE: Bio-Stabilization
CLIENT: Hazelwood School District
APPROX VALUE:   $225,000
CG: Bommarito Utilities, Structural Engineering - Aspen

PROJECT SUMMARY: 
This bio-stabilization job consisted of creek bank stabilization and vegetated gabion baskets to control erosion.

PROJECT SOLUTION:
Over 500 cubic yards of vegetated gabion baskets, 2,500 tons of MoDot Type 2 rock and 4 inch thick erosion control blankets were used in this project.  A turf reinforcement mat was used above the wall supplemented by native plantings.

SPECIAL CONSIDERATIONS:
Crews has to excavate six feet below grade into the creek bottom in order to begin the wall at the proper engineering height.  This was necessary to stabilize a sanitary sewer line running parallel with the creek within only a few feet of the new wall.  This also meant a muddy and messy start to the project.