SPENCER CREEK STORMWATER IMPROVEMENTS

PROJECT TYPE:  City of St. Peters
CLIENT:  Bio-Stabilization
APPROX VALUE:   $475,000
DURATION:  

PROJECT SUMMARY: 
This project consisted of various rock grade controls, toes, and rock slopes to control erosion and water flow.

PROJECT SOLUTION:
Over 5,000 tons of D90 18-24" riprap were placed over 1 acre of clearing and grubbing.  Over 7370 plants, including many native species of shrubs and trees, we planted on the site once grade works was complete.

SPECIAL CONSIDERATIONS:
The design here was different in that it uses step grade control, or essentially a series of small water falls to control moving water over a grade change.  Gradual changes in grade reduce the force of water flowing over one massive height, creating backwash and severe bank erosion.