PROJECT SUMMARY:
Repair sever storm drainage erosion behind a group of
condominiums in St. Peters.
PROJECT SOLUTION:
This project consisted of a variety of bank stabilization
including gabion baskets, retaining walls, live crib walls, and
reinforced TRM's. Plant restoration included container
plantings as well as live stakes.
SPECIAL CONSIDERATIONS:
As with most bio-stabilization jobs, considerations at the site
included access, wet and muddy conditions, and sensitivity to
nearby residents whose property backed up onto the site.